Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-226
Quote Date June 5, 2023
Valid Until June 9, 2023
Total Rs. 3,238,230.00
To:
FG girls College Karachi Cantt

Zoology Lab

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Job Demolishing the existing roof with opening & hollow the beams including removal of debris.
Rs. 225,000.000.00%Rs. 225,000.00
1610 Sqf Providing & laying new R.C.C Roof with reinforcement of iron steel 3/8" both ways 7" x 7" C to C with reinforcement of beam & pouring the concrete to ratio 1:2:4 complete with shuttering, pouring & electrical pipes as per existing point.

DETAILS
Iron Steel 3/8 in roof & 1/2 in beams.
Reti & Crush.
Lucky cement will be used.
Shuttering & pouring included.
Floor tiles & Marble if broken will be charged extra.
Electrical pipes will be replaced with new one.
Electrical wires, Lights & fans will be removed & re-fixed the same.

Rs. 1,550.000.00%Rs. 2,495,500.00
1 job Cost of labor & material for plastering the beam & roof.
Rs. 207,000.000.00%Rs. 207,000.00
1610 Sqf Providing & laying 2" thick screeding on roof top with proper slope in Avg ration 1:2:4
Rs. 110.000.00%Rs. 177,100.00
1610 Sqf Water proofing with hot bitumin coating including 1onz fabric protection & top coating in 80/100 & 10/20 bitumin coat Rs. 83.000.00%Rs. 133,630.00
Sub Total Rs. 3,238,230.00
Tax Rs. 0.00
Total Rs. 3,238,230.00