Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-125
Quote Date January 7, 2023
Valid Until February 3, 2023
Total Rs. 1,203,620.00
To:
Karachi Grammar School

-

Civil Work of KG block ( Area facing to parking). Junior Section

Hrs/Qty Service Rate/PriceAdjustSub Total
3500 Sqf Cutting , Chiseling & Removing

Existing layer to be removed upto RCC floor for water proofing . After removal process the complete surface of the floor should have to power grinded in order
to remove the weak repairs and all the lose material from the surface , All the fine cavities on floor parapet walls cracked to repaired If r/f of floor found exposed
it must be treated with anti rusting chemicals (zuba 16/123 or equivalent ) if large cavity found in slab it must be plugged properly by using a non shrinkage grout
( Fospak , ressichem or equivalent ) .Including shifting of debris from roof top to ground by using wench machine and from school premises through trucks as
per instruction of school management (Inclined portion)

Rs. 69.000.00%Rs. 241,500.00
1600 Rft Cant Strip (Cement Concrete Chamfered Edge - Gola)

Providing and making cant strip (cement concrete Chamfered edge gola) approx. 0'-6" to 0'-8"chamfered with Ratio 1:2:4 and fibre ( Recron , matrix or
equivalent )on edges of parapet wall, inverted beam floor and wall junction around roof and around rain water spouts as per site requirement with smooth
trowel finish . before making of Cant strip the surface to be prepared by tucking or grinding for making surface rough for proper bonding .Complete in all aspects
as directed by school management .

Rs. 207.000.00%Rs. 331,200.00
17 Nos Repairing and Plastering on inverted beam with SBR

Providing and applying of Plaster , (1/2",3/4" ) thick upto required depth , on inverted beam of size 3'x20 using 1:4 cement sand ratio using zuba 16 /123 on
inverted beam or concrete where required using 1:2:4 ratio ,water tight shuttering including application of anti rusting chemical(Fospak , Ressichem or
equivalent )on exposed steel including removing of rust through wire brush, ,expanded metal mesh of 10 gauge at junction wherever else required, with SBR as
per standard ratio by 1 part of SBR : 1 part of water :4 parts of Cement (by Volume ) with smooth finish , curing etc

Rs. 20,700.000.00%Rs. 351,900.00
14 nos Rain Water Spouts

Removing of existing rain water spouts including cutting of concrete of surrounding area and shifting from top to ground floor using wench machine . Fixing of
4 inch dia pipe (PVC STEELEX PIPE) of approved quality of approx. length of 2FT with concrete of surrounding area complete in all aspects as directed by
Engineer in charge .

Rs. 3,680.000.00%Rs. 51,520.00
250 Rft Removing and treatment of expansion joint ( Polyurethane )

Removing of material of expansion joint cleaning thoroughly all expansion joint including fixing of backer roads (25mm-50mm) and using
Polyurethane chemical (sika fospak or equivalent ) above bekar rod to match the top surface of roof . It’s a totally responsibility of contractor all expansion joint must
be water proof . ( The area is exposed to atmosphere ) .
Note:
( Polyshulphide chemical is not available market practice is with polyurethane filing of all exposed areas)

Rs. 910.000.00%Rs. 227,500.00
Sub Total Rs. 1,203,620.00
Tax Rs. 0.00
Total Rs. 1,203,620.00