Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-59
Quote Date July 23, 2022
Valid Until July 26, 2022
Total Rs. 928,000.00
To:
FG Public School (Boys) Abbysina Lines

-

Water Proofing

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Job Providing and Laying bitumen coating with Jute 50 LBS on top and flood coat of 100/80 and 10/20 mixture of bitumen after seal coat of Primer and spread of P gravel on top

Complete roof top size approx 12500sqft (Cost 1540000)
Working Approx Area 6500 Sqft
Area starting from extension joint to extreme right boundary

Rs. 780,000.000.00%Rs. 780,000.00
1 job Repairing of damaged area of roof with 1:4 C.C mortar to remove depression (on two marked depression) and maintain existing slope.

Approx area 800sqft

Rs. 88,000.000.00%Rs. 88,000.00
1 job Making CC gola along with parapet wall Rs. 60,000.000.00%Rs. 60,000.00
Sub Total Rs. 928,000.00
Tax Rs. 0.00
Total Rs. 928,000.00