Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-114
Quote Date November 29, 2022
Total Rs. 5,987,160.00
To:
Medical BN 132

Renovation work in special children school

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Job Paint work

28 Drums Distemper 4700/- 131600/-
20 Drums Weather shield 16000/- 320000/-
12 Drums Primer 11800/- 141600/-
20 Drum Putty 2700/- 54000/-
20 Gallon oil Paint 3100/- 62000/-
40 ltr Mixing oil 310/- 12400/-
Sand paper, POP & etc 20000/-
Labor Charges 280000/-

Rs. 1,021,600.000.00%Rs. 1,021,600.00
1 Job False Ceiling in 1 room and 1 washroom and replacement of sheets only in different rooms
Rs. 54,500.000.00%Rs. 54,500.00
1 Job washroom work

cost of labour and material for chizling of floor only replacement of drain line and floor tiles existing basin and commode will be used.

Rs. 30,000.000.00%Rs. 30,000.00
1 job Roof treatment

Providing and repairing of all building roofs fill all the cracks with CC mortor mixed with bonding agent

Rs. 360,000.000.00%Rs. 360,000.00
1 Job Waterproofing

Cost of labor and material for laying of bituminous waterproofing 10/20 and 80/100

Rs. 1,488,000.000.00%Rs. 1,488,000.00
1 job cost of labor and material for CC repairs from all sides of building and boundary wall where necessary after chizzling and fixing of wire mash properly
Rs. 574,000.000.00%Rs. 574,000.00
1 Job Fiber Shade 120*12
Rs. 792,000.000.00%Rs. 792,000.00
1 SS Railing 304 grade Taiwan
Rs. 558,000.000.00%Rs. 558,000.00
1 Rubber Mat
Rs. 79,200.000.00%Rs. 79,200.00
1 transportation approx 7 to 8 trips
Rs. 32,000.000.00%Rs. 32,000.00
1 Profit Rs. 997,860.000.00%Rs. 997,860.00
Sub Total Rs. 5,987,160.00
Tax Rs. 0.00
Total Rs. 5,987,160.00