Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-229
Quote Date June 6, 2023
Total Rs. 2,958,000.00
To:
Mr Fahad Athar

-

R24 Scheme 33 labor Only

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Job Cost of plaster on 3rd floor, Roof top, Parapit wall, over head tank & stair case left over

150000

Rs. 200,000.000.00%Rs. 200,000.00
3500 Sqf Marble on floor virona/tirvera/tipi (sample will be provided approx 3500 sqft). including chemical polish on marble

Marble fixing & chemical polishing
630000

Rs. 120.000.00%Rs. 420,000.00
64 step Providing & fixing marble (oshianiq/tirverar) on steps with riser.

89600

Rs. 1,000.000.00%Rs. 64,000.00
1 Job Cost of Plumbing with fresh water & drain for 10 bathroom including drain line from top to bottom & 3 kitchen with drain & fresh water.

350000

Rs. 350,000.000.00%Rs. 350,000.00
1 Job Tile in washroom upto height of 7 ft in 10 washrooms size 6 x 4

614000

Rs. 210,000.000.00%Rs. 210,000.00
1 Job Tile in Back side open area

50862

Rs. 23,000.000.00%Rs. 23,000.00
1 Job Cost of Tile in kitchen

126000

Rs. 45,000.000.00%Rs. 45,000.00
1 job Cost of wooden door 27 no

389900

Rs. 67,000.000.00%Rs. 67,000.00
1 job Cost of 3 window on front elevation fixed panel 7 x 3

108675

Rs. 0.000.00%Rs. 0.00
1 nos Iron door on roof top

20000

Rs. 0.000.00%Rs. 0.00
1 Job Screeding on roof top

95000/-

Rs. 95,000.000.00%Rs. 95,000.00
1 Job Distemper Paint after necessary filing, scarping, sand papering, prime coat,

280000

Rs. 350,000.000.00%Rs. 350,000.00
1 Job Cost of weather shield on front elevation

45000

Rs. 40,000.000.00%Rs. 40,000.00
1 Job G.I pipe Railing from ground to roof top

200000

Rs. 0.000.00%Rs. 0.00
1 Job Pouring of over head tank roof & precast roof slab on roof top store room.

33000

Rs. 27,000.000.00%Rs. 27,000.00
1 Job Cost of Commode, WC, wash basin & flush tank.

320000

Rs. 30,000.000.00%Rs. 30,000.00
1 Job Bathroom sets including basin mixer, shower mixer, muslim shower & floor Jali.

190000

Rs. 30,000.000.00%Rs. 30,000.00
1 Job Kitchen sink with mixer & waste pipe etc.

33000

Rs. 12,000.000.00%Rs. 12,000.00
0 Providing & making Kitchen counter in lassani lamination with marble top drawing will be provided.

275000/- x 3 = 825000/-

Rs. 275,000.000.00%Rs. 0.00
1 Job Cost of Bathroom set Accessories

15000

Rs. 30,000.000.00%Rs. 30,000.00
1 job Wardrobe 7 x 6

67000 each

Rs. 0.000.00%Rs. 0.00
1 Job Aluminium Windows 12 nos

336375

Rs. 0.000.00%Rs. 0.00
1 Job Under Ground over head tank & Outside main chamber

6500

Rs. 5,000.000.00%Rs. 5,000.00
1 Job Outside elevation Step 4 no

25000

Rs. 10,000.000.00%Rs. 10,000.00
1 job Stone on Front elevation

90562

Rs. 0.000.00%Rs. 0.00
1 Job Cost of Supervision & profit Rs. 950,000.000.00%Rs. 950,000.00
Sub Total Rs. 2,958,000.00
Tax Rs. 0.00
Total Rs. 2,958,000.00