1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi
Quote Number | QUO-26 |
Quote Date | February 15, 2022 |
Total | Rs. 2,682,400.00 |
Mr.Salman Yousuf Residence work
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
980sqft | Providing and fixing stones on boundary of Garden and Bungalow surrounding in 1" strips as per pillar approx 1000 sqft bill will be made on actual measurement |
Rs. 395.00 | 0.00% | Rs. 387,100.00 |
54sqft | Aluminium window for basement (3 windows ) |
Rs. 1,250.00 | 0.00% | Rs. 67,500.00 |
1 | Removal of S.S railing and re fixing on in basement |
Rs. 21,000.00 | 0.00% | Rs. 21,000.00 |
1 | fly screen in all windows and ventilators (labour only) flyscreen 1 roll will be provided by you |
Rs. 18,000.00 | 0.00% | Rs. 18,000.00 |
52cft | Wooden floor on steps and entrance after removal of granite approx labour (Wood will be supplied by you cost of wood Redmaranti 5200/cft it is included |
Rs. 7,300.00 | 0.00% | Rs. 379,600.00 |
2 nos | New Tiles in study and powder washroom after removal of old tiles and laying the new ones (1500 sqmtr) basic cost of tiles including plumber labour ( faucets /ceramic will be provided by you ) removal of old tiles |
Rs. 120,000.00 | 0.00% | Rs. 240,000.00 |
1 | wall hanging camode with its points alteration and fixing of concealed tank with block masonry in mothers wash room. cost include porta tank porta wall hanging camode all necessary fittings |
Rs. 87,500.00 | 0.00% | Rs. 87,500.00 |
3 nos | Plumber labour for fixing of all faucets and ceramic . master wash room is not included |
Rs. 17,000.00 | 0.00% | Rs. 51,000.00 |
1 | 1 no S.s bracket for mother washroom basin |
Rs. 6,500.00 | 0.00% | Rs. 6,500.00 |
1 | providing and Fixing of new geyser in heavy 2 years guarantee for leakage cost of geyser Rs 47000/- fixing with fitting Rs 5000/- butler make |
Rs. 52,000.00 | 0.00% | Rs. 52,000.00 |
1 | Washing area on roof top with Electric and drain/fresh water and paint |
Rs. 15,000.00 | 0.00% | Rs. 15,000.00 |
1 | Polish work on all doors and windows and main door matt finish polish with lacqer finish |
Rs. 445,000.00 | 0.00% | Rs. 445,000.00 |
1 | Paint inside and outside front and boundary wall |
Rs. 415,000.00 | 0.00% | Rs. 415,000.00 |
1 | electrician Labour charges scope not defined |
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 | Basement solid wooden door with aluminum sheet |
Rs. 24,000.00 | 0.00% | Rs. 24,000.00 |
12 | Lights on boundary wall after cutting of wall including wire pipe and lights (1500 each) basic rate of light is 1500/ wire pipe and cutting included. |
Rs. 4,800.00 | 0.00% | Rs. 57,600.00 |
1 | Boundary wall cracks filling with wire mash and rubber concrete chemical |
Rs. 28,000.00 | 0.00% | Rs. 28,000.00 |
1 | Safety wire with current on boundary wall |
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 | servant Qtr washroom W.C and pipe replace with new tiles replacement of w.c.,chowk line and floor tiles |
Rs. 29,000.00 | 0.00% | Rs. 29,000.00 |
700 aprx | Wooden skirting after removal of tiles skirting with polish finish actual will be bill |
Rs. 248.00 | 0.00% | Rs. 173,600.00 |
1 | master wash room revamp scope not define |
Rs. 0.00 | 0.00% | Rs. 0.00 |
2 | false ceiling alteration |
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 | chemical treatment inside and out side walls on affected areas | Rs. 185,000.00 | 0.00% | Rs. 185,000.00 |
Sub Total | Rs. 2,682,400.00 |
Tax | Rs. 0.00 |
Total | Rs. 2,682,400.00 |