Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-212
Quote Date May 16, 2023
Total Rs. 3,646,275.00
To:
KIMS

Malir

Parking Area

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Job Providing & making MS Shade in parking area as per the existing size with 3", iron channel 4", gardar 4" round pipe with corrugated G.I sheet on top of include labor, material. cartage for the work.
Rs. 2,225,400.000.00%Rs. 2,225,400.00
1 job Cost of labor & materiel for leveling & raise up the floor upto the required height & laying of base course upto 4" with compaction with ten ton vibrating roller & water will be supplied by KIMS.
Rs. 373,500.000.00%Rs. 373,500.00
7125 Providing and laying of paver Grey 60mm CC pavers caracrete make after spreading of khaka sand in proper sloping and leveling with compaction Rs. 147.000.00%Rs. 1,047,375.00
Sub Total Rs. 3,646,275.00
Tax Rs. 0.00
Total Rs. 3,646,275.00