Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-525
Quote Date May 24, 2024
Total Rs. 1,652,680.00
To:
fg junior public school karachi cantt

New Washroom block boys / girls 4 WC each

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Job Cost of making New Boys washroom block on 1st floor above library.

Cost include making of block masonry wall plaster from outside
Precast roof slab with top screed
Laying of fresh water & drain line
Laying of tiles inside upto 5fts on wall & floor complete
fixing of 4 WC, 1 wash basin with complete taps.
Electric Work 1 point each washroom
Paint Complete inside outside

Rs. 669,340.000.00%Rs. 669,340.00
1 Job Cost of making New Girls washroom block on 1st floor above library.

Cost include making of block masonry wall plaster from outside
Precast roof slab with top screed
Laying of fresh water & drain line
Laying of tiles inside upto 5fts on wall & floor complete
fixing of 4 WC, 1 wash basin with complete taps.
Electric Work 1 point each washroom
Paint Complete inside outside

Rs. 669,340.000.00%Rs. 669,340.00
2 no Providing & fixing Fiber tank above washroom
Rs. 53,000.000.00%Rs. 106,000.00
8 nos UPVC Door with frame Rs. 26,000.000.00%Rs. 208,000.00
Sub Total Rs. 1,652,680.00
Tax Rs. 0.00