1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi
Quote Number | QUO-67 |
Quote Date | August 3, 2022 |
Total | Rs. 1,195,872.00 |
MRC | Water Proofing
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
8820 sft | Providing and laying bituminous water proofing with jute felt after applying of primer coat and mixture of 80 /100 & 10/20 bitumin sealed coat with bitumen, 2 layers of flood coat, spreading of pea gravels on top after applying of bituminous final coat |
Rs. 73.00 | 0.00% | Rs. 643,860.00 |
8820 sft | Cost of labor charges for scraping / cleaning of roof before applying primer coat |
Rs. 10.00 | 0.00% | Rs. 88,200.00 |
1 | Cartage |
Rs. 4,500.00 | 0.00% | Rs. 4,500.00 |
4000 sft | Providing & leveling the floor in proper sloping where required & repairing of cracks with C.C mottor after chizlling the crack wide ( Approx Area : 4000 sqft actual will be measured after the work, bill will be made as per actual measurement) |
Rs. 65.00 | 0.00% | Rs. 260,000.00 |
1 | Profit | Rs. 199,312.00 | 0.00% | Rs. 199,312.00 |
Sub Total | Rs. 1,195,872.00 |
Tax | Rs. 0.00 |
Total | Rs. 1,195,872.00 |