Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-67
Quote Date August 3, 2022
Total Rs. 1,195,872.00
To:
CMH Malir

MRC | Water Proofing

Hrs/Qty Service Rate/PriceAdjustSub Total
8820 sft Providing and laying bituminous water proofing with jute felt after applying of primer coat and mixture of 80 /100 & 10/20 bitumin sealed coat with bitumen, 2 layers of flood coat, spreading of pea gravels on top after applying of bituminous final coat
Rs. 73.000.00%Rs. 643,860.00
8820 sft Cost of labor charges for scraping / cleaning of roof before applying primer coat
Rs. 10.000.00%Rs. 88,200.00
1 Cartage
Rs. 4,500.000.00%Rs. 4,500.00
4000 sft Providing & leveling the floor in proper sloping where required & repairing of cracks with C.C mottor after chizlling the crack wide

( Approx Area : 4000 sqft actual will be measured after the work, bill will be made as per actual measurement)

Rs. 65.000.00%Rs. 260,000.00
1 Profit Rs. 199,312.000.00%Rs. 199,312.00
Sub Total Rs. 1,195,872.00
Tax Rs. 0.00
Total Rs. 1,195,872.00