1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi
| Quote Number | QUO-67 |
| Quote Date | August 3, 2022 |
| Total | Rs. 2,021,894.00 |
MEDICAL OPD | Water Proofing
| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 14764 sf | Providing and laying bituminous water proofing with jute felt after applying of primer coat and mixture of 80 /100 & 10/20 bitumin sealed coat with bitumen, 2 layers of flood coat, spreading of pea gravels on top after applying of bituminous final coat |
Rs. 73.00 | 0.00% | Rs. 1,077,772.00 |
| 14764 sf | Cost of labor charges for scraping / cleaning of roof before applying primer coat |
Rs. 10.00 | 0.00% | Rs. 147,640.00 |
| 1 | Cartage |
Rs. 4,500.00 | 0.00% | Rs. 4,500.00 |
| 7000 sft | Providing & leveling the floor in proper sloping where required & repairing of cracks with C.C mottor after chizlling the crack wide ( Approx Area : 7000 sqft actual will be measured after the work, bill will be made as per actual measurement) |
Rs. 65.00 | 0.00% | Rs. 455,000.00 |
| 1 | Profit | Rs. 336,982.00 | 0.00% | Rs. 336,982.00 |
| Sub Total | Rs. 2,021,894.00 |
| Tax | Rs. 0.00 |
| Total | Rs. 2,021,894.00 |