| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 1 Job | Demolishing work Boundary wall, chajjas all grove plaster on balcony side wall groves upto the height |
Rs. 92,000.00 | 0.00% | Rs. 92,000.00 |
| 1 Job | Removal of debris |
Rs. 37,000.00 | 0.00% | Rs. 37,000.00 |
| 1 job | Boundary wall design Providing & making block masonry wall panels on both sides of boundary raising its height upto 8ft, cost also includes extension of gate column upto 8ft. |
Rs. 85,000.00 | 0.00% | Rs. 85,000.00 |
| 1 Job | Casting of RCC chajja on main gate with AVG 1:2:4 cement sand ratio including iron steel, shuttering & pouring complete. (RCC shade from pillar to pillar ) |
Rs. 97,000.00 | 0.00% | Rs. 97,000.00 |
| 1 Job | Stone Work Providing & fixing coupon on top of boundary wall |
Rs. 338,500.00 | 0.00% | Rs. 338,500.00 |
| 1 job | Providing & plastering the block masonry extension of boundary wall & grove plaster horizontal including 4 nos groves on other side beside the balconies |
Rs. 180,000.00 | 0.00% | Rs. 180,000.00 |
| 1 job | Staircase tower repair Providing & repairing the stair case tower roof from inside after necessary chiseling of lose plaster & repair with 1:4 avg cement sand ratio |
Rs. 169,000.00 | 0.00% | Rs. 169,000.00 |
| 1 Job | Providing and casting the RCC perapit wall over the tapered roof, after grouting the iron bars inside the existing beam. Cost also includes plaster from both sides and cc floor from inside after filling with empty flower pots. |
Rs. 425,000.00 | 0.00% | Rs. 425,000.00 |
| 1 Job | Providing & making block masonry mass 4" thick with roof plaster 2.5ft width on each side ( left & right side) | Rs. 87,500.00 | 0.00% | Rs. 87,500.00 |
| Sub Total | Rs. 1,511,000.00 |