Quote Number | QUO-653 |
Quote Date | May 24, 2025 |
Total | Rs. 5,271,520.00 |
DHA bungalow # 265
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
1 Job | Bathroom tiles Tiling upto 10ft height on walls & floor |
Rs. 429,120.00 | 0.00% | Rs. 429,120.00 |
1 Job | Plumbing Plumbing of 7 no washroom & 2 fiber washroom including 2 no kitchens,1 nos washing area, grease kitchen, all fresh water & drain line, septic tank connection & main drain. |
Rs. 380,000.00 | 0.00% | Rs. 380,000.00 |
1 job | Septic Tank Excavation upto approx. 8ft depth & 6ft length & 4ft width including bock masonry & plaster from inside with precast roof with screeding on top with back filing upto the floor level |
Rs. 287,000.00 | 0.00% | Rs. 287,000.00 |
1 Job | Raising Doors & windows Raising all windows & doors upto 8ft height after cutting & fixing of new wooden frame. |
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 job | Water proofing with material 7 nos washroom floor, overhead tank & roof top flower bed |
Rs. 120,000.00 | 0.00% | Rs. 120,000.00 |
1 job | Paint inside & outside Paint inside 2 coats of plastic emulsion / water matt after necessary scraping, filling & sand papering. (oil matt labor will be added) |
Rs. 500,000.00 | 0.00% | Rs. 500,000.00 |
1 Job | Polish labor with material Providing & polishing on staircase railing & all windows & door with frame with lacer finish from inside & weather proof varnish finish from outside. |
Rs. 750,000.00 | 0.00% | Rs. 750,000.00 |
1 Job | Addition & alteration (approximate amount) Making new Wall from guard room to building wall upto 7ft height, making wall in kitchen ground floor, making feature wall & vanities in 7 nos washroom, lean concrete with neero finish in 7 nos washroom, chiseling of all wall cracks inside & fixing of wire mesh with repair, main holes for drain line, CC jacketing on drain line, cost include material shifting from outside to inside ground to 1st floor, making of flower bed on roof top & 2 wall. |
Rs. 585,000.00 | 0.00% | Rs. 585,000.00 |
1 job | A/c piping labor Fixing of AC copper pipe with wire & drain after cutting of wall & repair |
Rs. 90,000.00 | 0.00% | Rs. 90,000.00 |
1 Job | Debris Removal |
Rs. 73,000.00 | 0.00% | Rs. 73,000.00 |
1 Job | Electric wiring complete. |
Rs. 870,000.00 | 0.00% | Rs. 870,000.00 |
1 Job | False ceiling |
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job | Floor tiles |
Rs. 752,400.00 | 0.00% | Rs. 752,400.00 |
1 Job | Roof Marble |
Rs. 130,000.00 | 0.00% | Rs. 130,000.00 |
1 job | 3 Side walk way & car porch tile |
Rs. 305,000.00 | 0.00% | Rs. 305,000.00 |
1 job | Stone Work |
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 job | Grease kitchen pantry |
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job | Elevation |
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job | Gazebo on roof top | Rs. 0.00 | 0.00% | Rs. 0.00 |
Sub Total | Rs. 5,271,520.00 |
Tax | Rs. 0.00 |
Total | Rs. 5,271,520.00 |