Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-697
Quote Date May 24, 2025
Total Rs. 4,950,467.00
To:
Private

DHA bungalow # Update

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Job Bathroom tiles

Tiling upto 10ft height on walls & floor

Rs. 307,000.000.00%Rs. 307,000.00
1 Job Plumbing

Plumbing of 5 no washroom & 2 fiber
washroom including 2 no kitchens,1 nos washing area, grease kitchen, all fresh
water & drain line, septic tank connection

Rs. 330,000.000.00%Rs. 330,000.00
1 Job Raising Doors & windows

Raising windows & doors upto 8ft height after cutting & fixing of new wooden frame.

Rs. 40,000.000.00%Rs. 40,000.00
1 job Water proofing with material

Water proofing with material
7 nos washroom floor, overhead tank

Rs. 120,000.000.00%Rs. 120,000.00
1 job Paint inside & outside

Paint inside 2 coats of plastic emulsion / water matt after necessary scraping, filling & sand papering. (oil matt labor will be added)
exterior paint 2 coats of weather shield / distemper after necessary filling & prime coat.

Rs. 500,000.000.00%Rs. 500,000.00
1 Job Addition & alteration

Addition & alteration (approximate amount)
Making new Wall from guard room to
building wall upto 7ft height, making feature
wall & vanities in 5 nos washroom, lean
concrete with neero finish in 5 nos
washroom, chiseling of all wall cracks
inside & fixing of wire mesh with repair,
main holes for drain line, CC jacketing on
drain line, cost include material shifting
from outside to inside ground to 1st
floor.

Rs. 585,000.000.00%Rs. 585,000.00
1 job A/c piping labor

Fixing of AC copper pipe with wire & drain after cutting of wall & repair

Rs. 147,800.000.00%Rs. 147,800.00
1 Job Debris Removal
Rs. 73,000.000.00%Rs. 73,000.00
1 Job Electric wiring complete.
Rs. 870,000.000.00%Rs. 870,000.00
1 Job Floor tiles
Rs. 752,400.000.00%Rs. 752,400.00
1 Job Elevation Approx
Rs. 312,500.000.00%Rs. 312,500.00
1 Job Closing all windows with block maonary & plaster inside & outside fixing of wire mesh on edges, Construction of 4 new walls & closing of 7 nos ventilators
Rs. 187,300.000.00%Rs. 187,300.00
1 Job MS Staircase Labor
Rs. 115,000.000.00%Rs. 115,000.00
1 Job Core Cutting for Exhuast fan pipe
Rs. 47,100.000.00%Rs. 47,100.00
1 Job Staircase Demolishing
Rs. 100,000.000.00%Rs. 100,000.00
1 Job Other Purchase
Rs. 56,315.000.00%Rs. 56,315.00
1 Job MS Staircase Material Rs. 407,052.000.00%Rs. 407,052.00
Sub Total Rs. 4,950,467.00
Tax Rs. 0.00
Total Rs. 4,950,467.00