1 |
Providing and laying tiles 2x2 on floor and walls upto 5ft height
|
Rs. 842,441.00 | 0.00% | Rs. 842,441.00 |
1 |
Providing and making electrical points where required
|
Rs. 115,000.00 | 0.00% | Rs. 115,000.00 |
1 |
Cost of labor and material for making working counter in new lab and sterilisation room with marble top and cabinets Demolishing the wall in XRay room and repairing the edges, Making Block Masonary walls in XRay room for compressor area, Cutting of floor for Shifting of old and new compressor, Electric and drain lines from Hall to Backside of Xray room
|
Rs. 383,600.00 | 0.00% | Rs. 383,600.00 |
1 |
Providing & painting the entire wall with distemper paint on the upper half and oil paint on the lower half as per the approved shade/color after necessary scraping filling.
|
Rs. 270,000.00 | 0.00% | Rs. 270,000.00 |
1 job |
Providing and making 2x2 false ceiling with powder coated hanging suspension
|
Rs. 233,750.00 | 0.00% | Rs. 233,750.00 |
1 job |
Cost of LED lights in false ceiling.
|
Rs. 66,000.00 | 0.00% | Rs. 66,000.00 |
1 |
Cost of 2x2 box fans in false ceiling
|
Rs. 123,200.00 | 0.00% | Rs. 123,200.00 |
1 |
Profit |
Rs. 406,798.00 | 0.00% | Rs. 406,798.00 |