Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-91
Quote Date October 3, 2022
Total Rs. 24,300,000.00
To:
FG Public School Malir Cantt

-

-

Construction of 6 Class Room.

Hrs/Qty Service Rate/PriceAdjustSub Total
6600 Sqf Cost of labor & material Charges for construction of HSSC Block with 6 classroom, 1 staff room attached bath, admin room with attached bath, 2 toilet for boys & 2 for girls & stair case till roof top with terrace.

1- 6x Classrooms along with veranda 20+10
2- 2x Boys Wash rooms
3- 2x Girls Wash rooms
4- 1xStaff Room along with attached washroom
5- 1x Admin room along with wash room
Building Base 3 to 3.5 ft
Stairs for 1st Floor
Base for G+1
Dowel filling at roof

Rs. 3,300.000.00%Rs. 21,780,000.00
1 job Cost of furniture

40x Plastic Tablet chairs boss
1x Wooden Rostrum
1x Teacher Tablet
1x Teacher chair

Staff room
Central table
10x teachers chairs
2x shelf of 4 boxes 2x2

Admin office
1x Table
1x Chairs
1xClerk table
1x chair

1x 5 seater sofa 1+1+3

Rs. 1,620,000.000.00%Rs. 1,620,000.00
1 job Cost of lights & fans

4 fans per Room
2 Tube lights per Room
8 Tube lights in veranda passage

Rs. 350,000.000.00%Rs. 350,000.00
1 Job Overhead tank with fresh water supply and dilevery line. Rs. 550,000.000.00%Rs. 550,000.00
Sub Total Rs. 24,300,000.00
Tax Rs. 0.00
Total Rs. 24,300,000.00