Quote

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Quote Number QUO-79
Quote Date September 3, 2022
Total Rs. 1,311,886.00
To:
CMH Malir

C M H | Dental Clinic

Hrs/Qty Service Rate/PriceAdjustSub Total
1 job Cost of Labor charges for dismantling the exiting roof and chisling of floor tiles and remove the debris out of hall.
Rs. 55,082.000.00%Rs. 55,082.00
1 Job Providing & making false ceiling of 2 x 2 gypsum
Rs. 80,905.000.00%Rs. 80,905.00
1 Job Providing and laying of floor & wall tiles of size 2x2 with dry bond (sample will be provided)
Rs. 588,000.000.00%Rs. 588,000.00
1 job Cost of labour charges for cutting of wall and concealed all the pipes and wires properly and repair the same with C.C mortor after fixing of mesh
Rs. 77,000.000.00%Rs. 77,000.00
1 Job Providing and laying of electrical wires for lights and fans (million cable)
Rs. 55,902.000.00%Rs. 55,902.00
1 Job Providing and making 2 nos Aluminium glass door as per existing color and design
Rs. 76,706.000.00%Rs. 76,706.00
1 Job Providing and fixing of 24 nos 15 wats led lights
Rs. 45,738.000.00%Rs. 45,738.00
1 Job Providing and fixing of 4 nos ceiling fan 56"
Rs. 57,553.000.00%Rs. 57,553.00
1 Job Providing and supply 1 No's standing unit A/C 2 Tons Rs. 275,000.000.00%Rs. 275,000.00
Sub Total Rs. 1,311,886.00
Tax Rs. 0.00
Total Rs. 1,311,886.00