Quote Number | QUO-280 |
Quote Date | September 21, 2023 |
Total | Rs. 5,255,200.00 |
BOQ for NDP Manual Optimization
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
9500 Sqf | Providing and applying 2 coats of ICI/ Berger water base plastic emulsion paint with approved shade, complete with rubbing, filling of cracks with complete in all respect and as per instruction and satisfaction of Engineer. Wall Paint: (Plastic emulsion paint) |
Rs. 50.00 | 0.00% | Rs. 475,000.00 |
9000 Sqf | Providing and applying 2 coats of ICI/ Berger water Oil paint with approved shade, complete with rubbing, filling of cracks with complete in all respect and as per instruction and satisfaction of Engineer. Wall Paint: Oil Paint |
Rs. 60.00 | 0.00% | Rs. 540,000.00 |
38500 Sq | Providing and applying 2 coats of ICI/ Berger water base matt finish paint with approved shade, complete with rubbing, filling of cracks with complete in all respect and as per instruction and satisfaction of Engineer. GF + 1st + 2nd Ceiling Paint: (Distemper) |
Rs. 29.00 | 0.00% | Rs. 1,116,500.00 |
1 Job | Scaffolding charges For Paint works |
Rs. 275,000.00 | 0.00% | Rs. 275,000.00 |
6100 Sqf | Removal of existing flooring and application of chemical polished mosaic flooring. Methodology: |
Rs. 467.00 | 0.00% | Rs. 2,848,700.00 |
Sub Total | Rs. 5,255,200.00 |
Tax | Rs. 0.00 |
Total | Rs. 5,255,200.00 |