1 job |
Uplift the complete house upto the height of 16" height with debris with compaction complete
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job |
Dismentaling the existing door frames, windows, kitchen & store walls as per discuss
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job |
Soiling stone on floor & laying of lean concrete ratio avg 1:3:6 .
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 job |
Uplift all the door frame, windows & necessary block masonry, plaster etc
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job |
Labor charges for New electrical points in bedrooms, lounch, kitchen, drawing room with replacement of switch socket, all cutting in wall for new points is included (material is not included wire, pipe, switch, socket etc)
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 job |
Plumbing of kitchen & 3 bathroom with UPVC pipe, fittings etc.
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job |
Labor charges for Laying of tiles in kitchen & 3 washrooms
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 job |
Painting the entire house from inside with water based emulsion paint
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job |
Labor charges for laying of floor tiles
|
Rs. 0.00 | 0.00% | Rs. 0.00 |
1 Job |
Total Labor Charges for above mentioned work |
Rs. 975,000.00 | 0.00% | Rs. 975,000.00 |