1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi
Quote Number | QUO-190 |
Quote Date | April 19, 2023 |
Total | Rs. 621,500.00 |
-
Admin Building | Water Proofing
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
1 Job | Chizling of floor & removal of debris out of side. |
Rs. 35,000.00 | 0.00% | Rs. 35,000.00 |
1 job | Providing & laying of CC floor with Rubber concrete bonding agent with Approx 1:4 CC ratio after cleaning of roof & maintaining proper slope diverting rain water equally |
Rs. 240,000.00 | 0.00% | Rs. 240,000.00 |
1000 Sqf | Water proofing with hot bitumin coating on admin building roof including 1onz fabric protection & top coating in 80/100 & 10/20 bitumin coat |
Rs. 95.00 | 0.00% | Rs. 95,000.00 |
1 Job | Providing and laying top screed on top of stair case in proper slope with admix for additional strength |
Rs. 90,000.00 | 0.00% | Rs. 90,000.00 |
1700 Sqf | Water proofing with hot bitumin coating on academic building roof remaining portion including 1onz fabric protection & top coating in 80/100 & 10/20 bitumin coat | Rs. 95.00 | 0.00% | Rs. 161,500.00 |
Sub Total | Rs. 621,500.00 |
Tax | Rs. 0.00 |
Total | Rs. 621,500.00 |