1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi
Invoice Number | INV-0241 |
Invoice Date | October 18, 2023 |
Total Due | Rs. 0.00 |
Renovation Work | Mr Amir Paracha
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
1 job | Cost of labor & material for paint work Washroom |
Rs. 61,669.00 | 0.00% | Rs. 61,669.00 |
1 Job | Replacement of bulbs & 1 Exhaust Fan 1 Exhaust fan |
Rs. 17,330.00 | 0.00% | Rs. 17,330.00 |
1 job | Mother room A/C work. Material : 4370 |
Rs. 7,370.00 | 0.00% | Rs. 7,370.00 |
1 job | Marble Polish Car Porch & 1 Washroom |
Rs. 41,000.00 | 0.00% | Rs. 41,000.00 |
1 Job | Main Gate scraping & polishing with polyurethane sealer on top with spray machine. |
Rs. 165,000.00 | 0.00% | Rs. 165,000.00 |
470 Rft | Bird Spikes on ground floor, 1st floor & roof top parapet wall All Shades (chaga ) |
Rs. 450.00 | 0.00% | Rs. 211,500.00 |
1 Job | Water Drainage PVC grill in Patio area, cutting of floor as per required depth and width. |
Rs. 22,700.00 | 0.00% | Rs. 22,700.00 |
1 Job | Purchase of light |
Rs. 15,432.00 | 0.00% | Rs. 15,432.00 |
1 Job | Grouting in washroom & Outside pith |
Rs. 2,500.00 | 0.00% | Rs. 2,500.00 |
1 job | Roof Top Drain Point |
Rs. 12,000.00 | 0.00% | Rs. 12,000.00 |
1 Job | cost of labor & material for paint work Spiral stair case tower. |
Rs. 14,000.00 | 0.00% | Rs. 14,000.00 |
1 Job | Cost of lifting main gate from bottom after cutting of MS Pipe & re wielding it 3/4" away from floor |
Rs. 9,000.00 | 0.00% | Rs. 9,000.00 |
1 Job | Removal of last wooden panel & fixing of new golden teak wood panels after necessary routing as per design. | Rs. 23,500.00 | 0.00% | Rs. 23,500.00 |
Sub Total | Rs. 603,001.00 |
Tax | Rs. 0.00 |
Paid | -Rs. 603,001.00 |
Total Due | Rs. 0.00 |