4 nos |
Excavation of Land up to required depth for 4nos Soak pits and 4 Nos Septic Tanks.
|
Rs. 87,000.00 | 0.00% | Rs. 348,000.00 |
4 nos |
Cost of Laying RCC rings for Soak pits after leveling, soling stones, and Compaction and backfilling complete.
|
Rs. 44,300.00 | 0.00% | Rs. 177,200.00 |
4 no |
Cost of Making Septic Tanks with 8" thick wall with plaster & precast Roof.
|
Rs. 94,000.00 | 0.00% | Rs. 376,000.00 |
1 job |
Cost of demolishing of walls after removal of GI sheets from walls and ceiling.
|
Rs. 64,000.00 | 0.00% | Rs. 64,000.00 |
1 Job |
Cost of Laying of Block masonry & plaster for Washrooms
|
Rs. 155,000.00 | 0.00% | Rs. 155,000.00 |
1 Job |
Cost of Labor charges for plumbing work inside washrooms, cost includes concealed fresh Water & Drain line inside washroom block and fixing of Sanitary ware and Taps.
|
Rs. 125,000.00 | 0.00% | Rs. 125,000.00 |
1 job |
Cost of Laying of tiles inside washrooms on walls up to 6fts and floor.
|
Rs. 130,000.00 | 0.00% | Rs. 130,000.00 |
1 Job |
Cost of making abolution area with demolishing, block masonry, plaster, tiling, plumbing.
|
Rs. 565,000.00 | 0.00% | Rs. 565,000.00 |
1 Job |
Cost of labour for Laying of 2 main delivery lines from underground tanks to new over head tanks, cost also includes connection of new tanks to washrooms and ablution area.
|
Rs. 65,000.00 | 0.00% | Rs. 65,000.00 |
1 Job |
Cost of painting washroom, ablution area, office & outside boundary wall
|
Rs. 85,000.00 | 0.00% | Rs. 85,000.00 |
1 Job |
Cost of laying 6" drain pipe for washroom & ablution area to connect from septic tank & soak pit separate
|
Rs. 75,000.00 | 0.00% | Rs. 75,000.00 |
1 Job |
3D Designing charges |
Rs. 40,000.00 | 0.00% | Rs. 40,000.00 |