Invoice

From:

1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi

Invoice Number INV-0285
Invoice Date March 29, 2024
Total Due Rs. 705,200.00
To:
Private

Ittat Masjid Toilet Work

Hrs/Qty Service Rate/PriceAdjustSub Total
4 nos Excavation of Land up to required depth for 4nos Soak pits and 4 Nos Septic Tanks.
Rs. 87,000.000.00%Rs. 348,000.00
4 nos Cost of Laying RCC rings for Soak pits after leveling, soling stones, and Compaction and backfilling complete.
Rs. 44,300.000.00%Rs. 177,200.00
4 no Cost of Making Septic Tanks with 8" thick wall with plaster & precast Roof.
Rs. 94,000.000.00%Rs. 376,000.00
1 job Cost of demolishing of walls after removal of GI sheets from walls and ceiling.
Rs. 64,000.000.00%Rs. 64,000.00
1 Job Cost of Laying of Block masonry & plaster for Washrooms
Rs. 155,000.000.00%Rs. 155,000.00
1 Job Cost of Labor charges for plumbing work inside washrooms, cost includes concealed fresh Water & Drain line inside washroom block and fixing of Sanitary ware and Taps.
Rs. 125,000.000.00%Rs. 125,000.00
1 job Cost of Laying of tiles inside washrooms on walls up to 6fts and floor.
Rs. 130,000.000.00%Rs. 130,000.00
1 Job Cost of making abolution area with demolishing, block masonry, plaster, tiling, plumbing.
Rs. 565,000.000.00%Rs. 565,000.00
1 Job Cost of labour for Laying of 2 main delivery lines from underground tanks to new over head tanks, cost also includes connection of new tanks to washrooms and ablution area.
Rs. 65,000.000.00%Rs. 65,000.00
1 Job Cost of painting washroom, ablution area, office & outside boundary wall
Rs. 85,000.000.00%Rs. 85,000.00
1 Job Cost of laying 6" drain pipe for washroom & ablution area to connect from septic tank & soak pit separate
Rs. 75,000.000.00%Rs. 75,000.00
1 Job 3D Designing charges Rs. 40,000.000.00%Rs. 40,000.00
Sub Total Rs. 2,205,200.00
Tax Rs. 0.00
Paid -Rs. 1,500,000.00
Total Due Rs. 705,200.00