1st Floor, Noor Square, Opp. Askari Park, Old Sabzi Mandi, Karachi
| Invoice Number | INV-0415 |
| Invoice Date | January 13, 2026 |
| Total Due | Rs. 2,761,820.00 |
Al Hamd Masjid
| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 1 Job | Demolishing the existing area through the debris out of site. |
Rs. 150,000.00 | 0.00% | Rs. 150,000.00 |
| 1 job | Providing & laying of block masonry walls with plaster |
Rs. 288,000.00 | 0.00% | Rs. 288,000.00 |
| 1 job | Providing & making 10 nos washroom with UPVC fresh water & drain line, Cost also include 6" PVC main drain with 3 nos main holes |
Rs. 344,820.00 | 0.00% | Rs. 344,820.00 |
| 1 Job | Providing & painting from inside with distemper after necessary scraping & putti filling. |
Rs. 65,000.00 | 0.00% | Rs. 65,000.00 |
| 175 Sqft | Providing & fixing UPVC door with frame size |
Rs. 1,300.00 | 0.00% | Rs. 227,500.00 |
| 1800 sqf | Providing & fixing of tile in washroom with dry bond & grout |
Rs. 375.00 | 0.00% | Rs. 675,000.00 |
| 8 nos | Providing & fixing of WC with flush tank, teecock & bibcock local |
Rs. 21,000.00 | 0.00% | Rs. 168,000.00 |
| 1 Job | Electric Work |
Rs. 120,000.00 | 0.00% | Rs. 120,000.00 |
| 2 no | Exuast fan 16" |
Rs. 9,000.00 | 0.00% | Rs. 18,000.00 |
| 2 nos | Providing & fixing of commode with flush tank, teecock & bibcock. |
Rs. 32,000.00 | 0.00% | Rs. 64,000.00 |
| 1 Job | Providing & fixing of granite vanity with 2 basin, taps with waste pipe |
Rs. 57,000.00 | 0.00% | Rs. 57,000.00 |
| 2 nos | Providing & fixing of bath mixer |
Rs. 16,000.00 | 0.00% | Rs. 32,000.00 |
| 1220 Sqf | Ablution area tile work |
Rs. 375.00 | 0.00% | Rs. 457,500.00 |
| 1 Job | Approved Granite top for ablution area 20 nos seats & top granite strip |
Rs. 95,000.00 | 0.00% | Rs. 95,000.00 |
| 1 Job | Cost of replacing of all pipes tank to ablution area |
Rs. 0.00 | 0.00% | Rs. 0.00 |
| 1 Job | Providing & fixing of outside floor tile |
Rs. 0.00 | 0.00% | Rs. 0.00 |
| 1 Job | Providing & fixing of bathroom wall tile |
Rs. 0.00 | 0.00% | Rs. 0.00 |
| 1 Job | Cost of Making water drinking area complete as per discussion |
Rs. 0.00 | 0.00% | Rs. 0.00 |
| 1 Job | Providing & fixing of precast roof slab up stair & outside |
Rs. 0.00 | 0.00% | Rs. 0.00 |
| 1 Job | Cost of laying new main sewerage line from outside with chamber |
Rs. 0.00 | 0.00% | Rs. 0.00 |
| 1 job | Providing & laying of tile on outside ablution area wall & masjid area floor. | Rs. 0.00 | 0.00% | Rs. 0.00 |
| Sub Total | Rs. 2,761,820.00 |
| Tax | Rs. 0.00 |
| Total Due | Rs. 2,761,820.00 |